![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-c-series/super-multi-nx-c-series_service-manual_3794977257.webp)
Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
SiE12-411
246
Removal Procedure
5
Lift up the control PCB.
6
Disconnect each wire
harness connector
linked to the control
PCB.
S31 (Pin 9): To CN14
S32 (Pin 5): To CN11
S33 (Pin 10): To S34
S71 (Pin 8): To S72
Step
Procedure
Points
H1 (yellow)
H2 (
b
l
u
e)
ECN1 (green)
Summary of Contents for Super Multi NX C-Series
Page 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...SiE12 411 vi Table of Contents...
Page 67: ...Specifications SiE12 411 56 Specifications...
Page 171: ...Instruction SiE12 411 160 System Configuration...
Page 225: ...Check SiE12 411 214 Service Diagnosis...
Page 295: ...SiE12 411 iv Index...