![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-c-series/super-multi-nx-c-series_service-manual_3794977249.webp)
Outdoor Unit (80 / 90 Class)
SiE12-411
238
Removal Procedure
1.10 Removal of Compressor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove the terminal
cover.
"
Be careful to avoid burning
the compressor terminals or
the nameplate.
2
Remove the overload
relay.
3
Disconnect the flag
shape terminal.
As precaution, keep the
contents in memorandum.
4
There is one nut fixing
the compressor.
Remove the nut with a
spanner.
Termin
a
l cover
N
(
b
rown)
W (
b
l
u
e)
V (yellow)
Termin
a
l n
a
mepl
a
te
U (red)
Overlo
a
d rel
a
y
Fixing
pl
a
te
Overhe
a
t protector
Summary of Contents for Super Multi NX C-Series
Page 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...SiE12 411 vi Table of Contents...
Page 67: ...Specifications SiE12 411 56 Specifications...
Page 171: ...Instruction SiE12 411 160 System Configuration...
Page 225: ...Check SiE12 411 214 Service Diagnosis...
Page 295: ...SiE12 411 iv Index...