![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-c-series/super-multi-nx-c-series_service-manual_3794977254.webp)
SiE12-411
Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Removal Procedure
243
4
Disconnect the
compressor relay
connector.
5
Remove the reactor
lead wire.
3. Removing the wiring
fixture
1
Remove 6 screws of
the wiring fixture.
4. Removing the electrical
box.
1
Remove 1 screw of the
electrical box.
Step
Procedure
Points
Re
a
ctor
Wiring fixt
u
re
Summary of Contents for Super Multi NX C-Series
Page 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...SiE12 411 vi Table of Contents...
Page 67: ...Specifications SiE12 411 56 Specifications...
Page 171: ...Instruction SiE12 411 160 System Configuration...
Page 225: ...Check SiE12 411 214 Service Diagnosis...
Page 295: ...SiE12 411 iv Index...