![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-c-series/super-multi-nx-c-series_service-manual_3794977238.webp)
SiE12-411
Outdoor Unit (80 / 90 Class)
Removal Procedure
227
1.4
Removal of PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the controller
PCB
1
Release the tab of the
electrical box, and open
the terminal board.
2
Disconnect each
connector of the
terminal board.
3
Unscrew 1 screw and
release two tabs to
remove the PCB
T
ab
B
as
e
ba
r
T
abs
Summary of Contents for Super Multi NX C-Series
Page 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...SiE12 411 vi Table of Contents...
Page 67: ...Specifications SiE12 411 56 Specifications...
Page 171: ...Instruction SiE12 411 160 System Configuration...
Page 225: ...Check SiE12 411 214 Service Diagnosis...
Page 295: ...SiE12 411 iv Index...