![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-c-series/super-multi-nx-c-series_service-manual_3794977261.webp)
Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
SiE12-411
250
Removal Procedure
2.6
Removal of Four Way Valve Coil, Solenoid Valve Coil,
Electronic Expansion Valve Coil and Thermistor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove 1 screw of the
four way valve coil.
2
Remove one screw of
the solenoid valve coil.
3
Remove the electronic
expansion valve coil for
each room.
"
Place the thermistor so that
its end comes up to the end
of the presser spring.
4
Release the thermistor
presser spring, and
remove the discharge
pipe thermistor.
"
Be careful not to lose the
presser spring for the
discharge pipe thermistor.
Di
s
ch
a
rge pipe
thermi
s
tor
Thermi
s
tor
pre
ss
er
s
pring
Thermi
s
tor
Pipe
Thermi
s
tor
pre
ss
er
s
pring
Summary of Contents for Super Multi NX C-Series
Page 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...SiE12 411 vi Table of Contents...
Page 67: ...Specifications SiE12 411 56 Specifications...
Page 171: ...Instruction SiE12 411 160 System Configuration...
Page 225: ...Check SiE12 411 214 Service Diagnosis...
Page 295: ...SiE12 411 iv Index...