![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-c-series/super-multi-nx-c-series_service-manual_3794977245.webp)
Outdoor Unit (80 / 90 Class)
SiE12-411
234
Removal Procedure
4
Remove the noise
insulation (top).
"
Carefully remove the noise
insulation, which is easily
torn in the piping section.
5
Remove the noise
insulation (inner).
6
Remove 1 screw of the
reactor.
Step
Procedure
Points
Noi
s
e in
su
l
a
tion
(top)
Noi
s
e in
su
l
a
tion
(inner)
Summary of Contents for Super Multi NX C-Series
Page 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...SiE12 411 vi Table of Contents...
Page 67: ...Specifications SiE12 411 56 Specifications...
Page 171: ...Instruction SiE12 411 160 System Configuration...
Page 225: ...Check SiE12 411 214 Service Diagnosis...
Page 295: ...SiE12 411 iv Index...