4
Set-up and installation
Installation and operating instructions
21
Daikin/ROTEX A2 F
Oil condensing boiler A2 F
008.1546499_02 – 04/2018 – EN
Fig. 4-10
Open the boiler control panel
5
Guide the cable to the boiler control panel and strip the insula-
tion. The cable length must be defined in such a way that the cir-
cuit board connectors can be connected to the board without
voltage.
Fig. 4-11
Cable guiding and strain relief
6
Inserting the cables in the controller housing.
7
Insert strain relief clips in the boiler control panel and ensure ef-
fective strain relief for all cables connected to the A2 F by means
of cable ties.
8
Check the holding force of the strain relief.
9
Lay cabling in the boiler control panel and establish electrical
connections according to the following sections.