Set-up and installation
Installation and operating instructions
27
Daikin/ROTEX A2 F
Oil condensing boiler A2 F
008.1546499_02 – 04/2018 – EN
Fig. 4-21
Installing the boiler cladding - Placing on the cover
(6)
3
Open the boiler control panel. Have the front panel ready.
Fig. 4-22
Installing the boiler cladding - opening the boiler control
panel
(6)
4
Establish a connection between the controller (operating panel)
and boiler control panel. Connect the cables to circuit board con-
nectors
J15
and
BU1
on circuit boardRoCon BE 2 and ensure
the strain relief of the cables (
Fig. 4-11
).
Fig. 4-23
Installing the boiler cladding - inserting the cables
(6)
5
Close the boiler control panel again.
Fig. 4-24
Installing the boiler cladding - closing the boiler control
panel
(6)
6
Guide the front panel to the device and let it engage in the side
panels. To do so, hold the front panel at the side by the sheet
metal part. First hook in the left side and press down, then hook
in the right side and press down.
(6)
For legend, see
Tab. 4-13