9
Service and maintenance
Installation and operating instructions
47
Daikin/ROTEX A2 F
Oil condensing boiler A2 F
008.1546499_02 – 04/2018 – EN
Fig. 9-4
Burner in the service position
3
Pull off and remove the condensate siphon from the flue gas el-
bow/remove the condensate box (accessory).
Fig. 9-5
Removing the siphon
4
Place a drip tray underneath.
Fig. 9-6
Placing a drip tray underneath
5
Open the four screws on top of the combustion chamber.
Fig. 9-7
Opening the combustion chamber
6
Remove the combustion chamber cover.
7
Remove the turbolators.
Fig. 9-8
Taking out the turbolators
8
Clean the turbolators with a soft cloth.