![Daihen Welbee WB-A350P Owner'S Manual Download Page 91](http://html1.mh-extra.com/html/daihen/welbee-wb-a350p/welbee-wb-a350p_owners-manual_3218080091.webp)
6-31
Chapter 6
W
elding Condition
S
ETTING
I
NTERNAL
F
UNCTIONS
W
ELDING
C
ONDITION
C
HAPTER
6
6.10.2.2 F2: Chenge in sequence at arc spot
This function can break arc even in the Arc Spot period when the torch switch is set to "OFF" in the Arc
Spot mode.
When this function is set to "ON" (enabled), hold the torch switch ON during the Arc Spot process.
• [ON]: This function is enabled so that arc is broken even in the Arc Spot period when the torch switch is
set to "OFF".
• [OFF]: This function is disabled.
6.10.2.3 F3: Chenge in sequence at CRATER-FILL ON (repeat)
In the CRATER-FILL ON (repeat) mode, welding current and crater current can be switched over with
each other by tapping the start switch. Press the start switch for a long time to stop welding.
• [ON]: This function is enabled.
• [OFF]: This function is disabled.
Example:
The welding flow will be as follows when the Initial welding current is set to 80 A, the Main welding
current to 100 A, and the Crater current to 60 A.
ON
ON
OFF
OFF
Torch switch
Gas flow
Pre-flow
Welding current
Welding current
Post-flow
Arc spot set time
ON
OFF
80A
60A
60A
60A
100A
100A
100A
Single-click
(0.3 sec. or less)
Press for 0.3 seconds
or more.
Torch switch
Welding
current
Crater-fil
㼘
Main welding
Initial current
Main welding
Main welding
Crater-fil
㼘
Crater-fil
㼘
Summary of Contents for Welbee WB-A350P
Page 2: ......
Page 8: ...TABLE OF CONTENTS vi MEMO ...
Page 28: ...PART NAMES PRODUCT SPECIFICATION AND CONFIGURATION CHAPTER 2 2 12 ...
Page 52: ...CONNECTION OF EXTERNAL EQUIPMENT CONNECTION CHAPTER 4 4 18 ...
Page 108: ...OPERATION OF ANALOG REMOTE CONTROL OPTIONAL WELDING CONDITION CHAPTER 6 6 48 ...
Page 138: ...REFERENCE DRAWING REFERENCE MATERIALS CHAPTER 10 10 4 10 2 1 Schematic diagram ...
Page 139: ...10 5 Chapter 10 Reference Materials REFERENCE DRAWING REFERENCE MATERIALS CHAPTER 10 ...