98-150471-A02
7-1
Chapter 7
Install
ation check
Installation check
7
Now that you have installed the system, you can test it to verify it is ready for customer
delivery. Follow the check lists below to test the system for proper operation.
•
Installation check list: Antenna
•
Installation check list: ACU, connectors and wiring
•
Installation check list: Functional test in harbor
7.1
Installation check list: Antenna
Step
Task
Further information
Done
1.
Check that the antenna is free of
obstructions.
2.
Make sure there is sufficient
space for access through the
service hatch.
3.
Make sure to maintain the
vertical orientation of the ADU
center line.
4.
Check that the ADU is installed
where vibrations are limited to a
minimum.
5.
Check that you programmed the
blocking zones correctly.
and
To set up blocking zones (RX and TX)
6.
Make sure that the safety
distance for radiation hazard is
47 metres.
Safe access to the ADU: Radiation
7.
Check that the mounting height
of the antenna is in accordance
with the ship’s min. roll period.
Ship motion and offset from the
Table 7-1: Installation check list: Antenna
SAILOR900HP.book Page 1 Monday, July 18, 2016 12:44 PM