CET-16 Service Manual Page 19
• If the water supply arrangement does not include a water treatment
system; refer
to figure 2-18, and verify that the cold water steam
generator feed and condenser feed lines are attached to the tee and
bulkhead coupling inside the steamer.
• If the water supply arrangement includes a water treatment system;
refer to figure 2-19, and verify that the cold water condenser feed lin
e
is attached to the tee and bulkhead coupling inside the steamer.
Verify that the steam generator supply outlet of the tee has been
securely capped.
5. Flush the water supply line before connecting it to the strainer intake
port
6. Apply pipe dope or teflon tape to the threads of the water supply line,
and securely connect the supply line to the strainer input port.
7. Turn on the untreated water supply, and check the lines for signs of
leakage, both outside and inside the steamer.
8. If no further work is required inside the SteamCraft V, secure the rear
panel in place using six mounting screws (figure 2-l5).
Printed 4/90
Summary of Contents for SteamCraft V
Page 56: ...Page 54 CET 16 Service Manual Figure 5 1 Block Diagram Printed 4 90...
Page 59: ...CET 16 Service Manual Page 57 Figure 5 2 Control Board Printed Circuit Board Printed 4 90...
Page 73: ...Page 72 CET 16 Service Manual Figure 6 1 MAJOR COMPONENT GROUPS...
Page 80: ...CET 16 Service Manual Page 79 Figure 6 6 ELECTRICAL COMPONENTS ASSEMBLY Printed 4 90...
Page 82: ...CET 16 Service Manual Page 81 Figure 6 7 FAN ASSEMBLY Printed 4 90...
Page 84: ...CET 16 Service Manual Page 83 Figure 6 8 CONDENSER AND DRAINAGE SYSTEMS Printed 4 90...
Page 86: ...CET 16 Service Manual Page 85 Figure 6 9 STEAM GENERATOR ASSEMBLY Printed 4 90...
Page 88: ...CET 16 Service Manual Page 87 Figure 6 10A DOUBLE WATER INLET ARRANGEMENT Printed 4 90...
Page 90: ...CET 16 Service Manual Page 89 Figure 6 10B SINGLE WATER INLET ARRANGEMENT Printed 4 90...