Page 6
CET-16 Service Manual
PREPARATION FOR INSTALLATION
Before unpacking and positioning the SteamCraft V, select and prepare
the installation site. This section of Chapter 2 details selection of the
SteamCraft operating location, and preparation of that site with power,
water, and drain lines
.
Water Quality Requirements
CAUTION
VOID WARRANTY
The use of steam generator feed water not within
the limits specified in this section of the manual
could void equipment warranties.
As with any steam generating equipment, water quality is a critical factor
in SteamCraft V performance. If Seed water is
tow in Total Dissolved
Solids (TDS) and free of particulate manner, the steam generator, heating
elements, and valves of the SteamCraft V will give years of trouble-free
service with a minimum of maintenance .
In some areas, even potable tap water contains a variety of impurities that
can cause costly problems in steam generating equipment. Of primary
concern are mineral salts, IPS, which remain behind as line or scale
deposits after the water has boiled away as steam. These deposits have
caused a variety of components to fail, including heating elements,
probes, and solenoid valves. Of equal importance is the toss of energy
efficiency due to line or scale buildup. In these areas, either a Steamer-
Gard water treatment system must
be installed, or time frequency of
maintenance, cleaning, and descaling must be increased.
It is critical to know the quality of the feed water before starting con-
struction of the water supply fines. If a SteamerGard water treatment
system must be installed to achieve acceptable water quality, it should be
installed before running the water supply lines to the SteamCraft V.
Contact a local water treatment specialist for an on-the-premises water
analysis. The recommended minimum feed water quality requirements for
the SteamCraft V are listed in
table 2-2
.
• If analysis shows that the supply water is within the required limits, a
single water connection can be installed as illustrated in
figure 2-2
.
• If analysis shows that the supply water is NOT within the required limits,
a SteamerGard water treatment system and two water supply lines
must be installed as illustrated in
figure 2-3
.
• If analysis shows that the supply water is NOT within the required limits,
and it is not possible to install a SteamerGard water treatment;
plan on increasing the frequency of maintenance, cleaning, and
descaling beyond that recommended
i
n the maintenance schedule
(Chapter 4, page 37).
Printed 4/90
Summary of Contents for SteamCraft V
Page 56: ...Page 54 CET 16 Service Manual Figure 5 1 Block Diagram Printed 4 90...
Page 59: ...CET 16 Service Manual Page 57 Figure 5 2 Control Board Printed Circuit Board Printed 4 90...
Page 73: ...Page 72 CET 16 Service Manual Figure 6 1 MAJOR COMPONENT GROUPS...
Page 80: ...CET 16 Service Manual Page 79 Figure 6 6 ELECTRICAL COMPONENTS ASSEMBLY Printed 4 90...
Page 82: ...CET 16 Service Manual Page 81 Figure 6 7 FAN ASSEMBLY Printed 4 90...
Page 84: ...CET 16 Service Manual Page 83 Figure 6 8 CONDENSER AND DRAINAGE SYSTEMS Printed 4 90...
Page 86: ...CET 16 Service Manual Page 85 Figure 6 9 STEAM GENERATOR ASSEMBLY Printed 4 90...
Page 88: ...CET 16 Service Manual Page 87 Figure 6 10A DOUBLE WATER INLET ARRANGEMENT Printed 4 90...
Page 90: ...CET 16 Service Manual Page 89 Figure 6 10B SINGLE WATER INLET ARRANGEMENT Printed 4 90...