CET-16 Service Manual
Table 2-1. Installation Check List
TASK
PAGE REFERENCE
COMPLETED
Preparation
6
Test SteamCraft V Water Supply
6
Install Water Treatment System
7
Select SteamCraft V location
7
Install Power Line
9
Extend Water Line(s)
10
Extend Drain Line
11
Installation
Unpack and Inspect SteamCraft V
13
Assemble Parts Shipped Loose
14
Position and Level SteamCraft V
16
Connect Electrical Line
17
Connect Untreated Water Line
18
Connect Treated Water Line
20
Connect Drain Line
20
Perform Setup and Checkout
21
Perform Function Test
23
equipment design and construction are
:
UL, A.G.A., ASME/N. Bd., NSF,
CSA, CGA, ETL, and others.
• This equipment is designed and certified for safe operation only when
permanently installed i
n
accordance with local and/or national codes.
Many local codes exist, and it is the responsibility of the owner and
installer to comply with these codes.
• In no event shall the manufacturer assume any liability for damage or
injury resulting from installations which are not in strict compliance with
the Installation Instructions and the codes cited above. Specifically, the
manufacturer will not assume any liability for damage or injury resulting
from improper installation of equipment, including, but not limited to,
temporary or mobile installations.
INSTALLATION OVERVIEW
Schematic Installation Diagram,
figure 2-1
, illustrates the various
electrical, water, and drain lines that must be connected to the SteamCraft
V. These lines can be constructed and connected to the SteamCraft V
easily and without delay if the various construction and installation tasks
are performed a planned sequence. Table 2-1 summarizes these tasks
and lists them in a recommended sequence. The Installation Checklist
outlines the overall installation process; the instructions referenced in the
table provide details Installation requirements may vary from site to site;
adapt the checklist accordingly.
Printed 4/90
Summary of Contents for SteamCraft V
Page 56: ...Page 54 CET 16 Service Manual Figure 5 1 Block Diagram Printed 4 90...
Page 59: ...CET 16 Service Manual Page 57 Figure 5 2 Control Board Printed Circuit Board Printed 4 90...
Page 73: ...Page 72 CET 16 Service Manual Figure 6 1 MAJOR COMPONENT GROUPS...
Page 80: ...CET 16 Service Manual Page 79 Figure 6 6 ELECTRICAL COMPONENTS ASSEMBLY Printed 4 90...
Page 82: ...CET 16 Service Manual Page 81 Figure 6 7 FAN ASSEMBLY Printed 4 90...
Page 84: ...CET 16 Service Manual Page 83 Figure 6 8 CONDENSER AND DRAINAGE SYSTEMS Printed 4 90...
Page 86: ...CET 16 Service Manual Page 85 Figure 6 9 STEAM GENERATOR ASSEMBLY Printed 4 90...
Page 88: ...CET 16 Service Manual Page 87 Figure 6 10A DOUBLE WATER INLET ARRANGEMENT Printed 4 90...
Page 90: ...CET 16 Service Manual Page 89 Figure 6 10B SINGLE WATER INLET ARRANGEMENT Printed 4 90...