CET-16 Service Manual Page 21
Final Setup And Checkout
This is a simple test procedure to verify that the electrical, water, and
drain lines have been property connected to the SteamCraft V. The test
also verifies basic operation of the steamer. For a more complete test of
the SteamCraft V functions, perform the Function Test on page 23.
Setup
1
.
Refer to Assembly (page 14) and verify that racks, guard, and cover
are properly
positioned in the steamer compartment.
2
.
Refer to figure 2-21, and dose the drain valve (handle points toward
right side of the unit).
Printed 4/90
Summary of Contents for SteamCraft V
Page 56: ...Page 54 CET 16 Service Manual Figure 5 1 Block Diagram Printed 4 90...
Page 59: ...CET 16 Service Manual Page 57 Figure 5 2 Control Board Printed Circuit Board Printed 4 90...
Page 73: ...Page 72 CET 16 Service Manual Figure 6 1 MAJOR COMPONENT GROUPS...
Page 80: ...CET 16 Service Manual Page 79 Figure 6 6 ELECTRICAL COMPONENTS ASSEMBLY Printed 4 90...
Page 82: ...CET 16 Service Manual Page 81 Figure 6 7 FAN ASSEMBLY Printed 4 90...
Page 84: ...CET 16 Service Manual Page 83 Figure 6 8 CONDENSER AND DRAINAGE SYSTEMS Printed 4 90...
Page 86: ...CET 16 Service Manual Page 85 Figure 6 9 STEAM GENERATOR ASSEMBLY Printed 4 90...
Page 88: ...CET 16 Service Manual Page 87 Figure 6 10A DOUBLE WATER INLET ARRANGEMENT Printed 4 90...
Page 90: ...CET 16 Service Manual Page 89 Figure 6 10B SINGLE WATER INLET ARRANGEMENT Printed 4 90...