21-22
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 21 DLPs A400 to A499
DLP-A441 Install Electrical Cables on the UBIC-H EIAs
Figure 21-1
Fully Cabled UBIC-H (A-Side)
Step 5
If available, tie wrap or lace the cables according to Telcordia standards (GR-1275-CORE) or local site
practice.
Note
When routing the electrical cables be sure to leave enough room in front of the alarm and
timing panel so that it is accessible for maintenance activity.
Step 6
Return to your originating procedure (NTP).
124534
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...