6-66
Cisco ONS 15454 Procedure Guide, R5.0
August 2005
Chapter 6 Create Circuits and VT Tunnels
NTP-A144 Create an E-Series Single-Card EtherSwitch Manual Cross-Connect
•
Circuit size
•
VLAN names
•
ONS nodes
Step 21
If the information is not correct, click the
Back
button and repeat Steps
through
with the correct
information. If the information is correct, check
Route Automatically
.
Step 22
Click
Finish
.
Step 23
Complete the
“DLP-A220 Provision E-Series Ethernet Ports” task on page 19-13
for each node that
carries the circuit.
Step 24
Complete the
“DLP-A221 Provision E-Series Ethernet Ports for VLAN Membership” task on
.
Step 25
Complete the
“NTP-A146 Test E-Series Circuits” procedure on page 6-72
for each node that carries the
circuit.
Step 26
To create additional circuits (spokes), repeat Steps
through
Stop. You have completed this procedure.
NTP-A144 Create an E-Series Single-Card EtherSwitch Manual
Cross-Connect
Note
In this procedure, cross-connect refers to a circuit connection created within the same node between the
Ethernet card and an OC-N card connected to third-party equipment. You create cross-connects at the
source and destination nodes so an Ethernet circuit can be routed from source to destination across
third-party equipment.
Step 1
Complete the
“DLP-A60 Log into CTC” task on page 17-66
at the node where you will create the circuit.
If you are already logged in, continue with
Step 2
If you want to assign a name to the circuit source and destination ports before you create the circuit,
complete the
“DLP-A314 Assign a Name to a Port” task on page 20-8
. If not, continue with
.
Step 3
If a high number of VLANs is already used by the network, complete the
Available VLANs” task on page 17-99
to verify that sufficient VLAN capacity is available. (You will
create a VLAN during each circuit creation task.)
Purpose
This procedure manually creates a single-card EtherSwitch cross-connect
between E-Series Ethernet cards and OC-N cards connected to non-ONS
equipment.
Tools/Equipment
E-Series Ethernet cards (E100T-12/E100T-G, E1000-2/E1000-2-G) must
be installed at the circuit source node.
Prerequisite Procedures
NTP-A127 Verify Network Turn Up, page 6-4
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...