17-36
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 17 DLPs A1 to A99
DLP-A29 Route DS-1 and DS-3/EC-1 Twisted-Pair Cables
Figure 17-17
Routing Coaxial Cable (SMB EIA Backplane)
Step 4
Return to your originating procedure (NTP).
DLP-A29 Route DS-1 and DS-3/EC-1 Twisted-Pair Cables
Step 1
Verify the following:
•
DS-1 electrical interface adapters are installed on every transmit and receive connector for DS-1
ports.
•
Wire-wrap posts on the DS-1 electrical interface adapters are used to connect the terminated
incoming cables.
Step 2
Tie-wrap or lace the DS-1 and DS-3/EC-1 twisted-pair cables according to local site practice and route
the cables into the side cutouts on either side of the ONS 15454.
Purpose
This task routes the DS-1 and DS-3/EC-1 twisted-pair cables.
Tools/Equipment
None
Prerequisite Procedures
DLP-A23 Install DS-1 Cables Using Electrical Interface Adapters (Balun),
page 17-28
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
B
A
Connector ends
Tie-wrap
posts
32079
Tie-wraps
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...