4-2
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 4 Turn Up Node
NTP-A24 Verify Card Installation
NTP-A24 Verify Card Installation
Step 1
Verify that two TCC2/TCC2P cards are installed in Slots 7 and 11.
Step 2
Verify that the green ACT (active) LED is illuminated on one TCC2/TCC2P card and the amber STBY
(standby) LED is illuminated on the second TCC2/TCC2P card.
Note
If the TCC2/TCC2P cards are not installed, or if their LEDs are not operating as described, do
not proceed. Repeat the
“DLP-A36 Install the TCC2/TCC2P Cards” task on page 17-42
to the
Cisco ONS 15454 Troubleshooting Guide
to resolve installation problems before
proceeding to
.
Step 3
Verify that cross-connect cards (XCVT or XC10G) are installed in Slots 8 and 10. The cross-connect
cards must be the same type.
Step 4
Verify that the green ACT (active) LED is illuminated on one cross-connect card and the amber STBY
(standby) LED is illuminated on the second cross-connect card.
Note
If the cross-connect cards are not installed, or if their LEDs are not operating as described, do
not proceed. Repeat the
“DLP-A37 Install the XCVT or XC10G Cards” task on page 17-45
, or
refer to the
Cisco ONS 15454 Troubleshooting Guide
to resolve installation problems before
proceeding to
.
Step 5
If your site plan requires an Alarm Interface Controller (AIC) or Alarm Interface
Controller-International (AIC-I) card, verify that the AIC/AIC-I card is installed in Slot 9 and its ACT
(active) LED displays a solid green light.
Step 6
Verify that electrical cards (DS-1, DS-3, EC-1, and DS3XM) are installed in Slots 1 to 6 or 12 to 17 as
designated by your installation plan.
Step 7
If your site plan requires an Ethernet card, verify that the Ethernet card is installed in the specified slot
and its ACT (active) LED displays a solid green light:
•
The E100T-12, E100T-12-G, E1000-2, and E1000-2-G cards are installed in Slots 1 to 6 or 12 to 17
•
The G1000-4 cards are installed in Slots 1 to 4 or 14 to 17.
•
The G1K-4, ML1000-2, and ML100T-12 cards can be installed in Slots 1 to 6 or 12 to 17 if an
XC10G cross-connect is installed. However, they must be installed in Slots 5, 6, 12, or 13 if XC or
XCVT cards are installed.
Purpose
This procedure verifies that an ONS 15454 node provisioned for SONET
is ready for turn-up.
Tools/Equipment
An engineering work order, site plan, or other document specifying the
ONS 15454 card installation.
Prerequisite Procedures
Chapter 1, “Install the Shelf and Backplane Cable”
Chapter 2, “Install Cards and Fiber-Optic Cable”
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Retrieve or higher
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...