6-82
Cisco ONS 15454 Procedure Guide, R5.0
August 2005
Chapter 6 Create Circuits and VT Tunnels
NTP-A304 Provision CE-100T-8 Ethernet Ports
Step 4
Click the
Provisioning > Port
tabs.
Step 5
Verify the following settings:
•
State—OOS,MT
•
Flow Control Neg—Checked or unchecked as indicated by the circuit or site plan
•
Max Size—Select between Jumbo and 1548 as indicated by the circuit or site plan
•
Media Type— SX, LX, ZX, CWDM, or DWDM
Step 6
Repeat Steps
through
for the destination node.
Step 7
At the destination node, connect the Ethernet test to the destination port and configure the test set to send
and receive the appropriate Ethernet traffic.
Note
At this point, you are not able to send and receive Ethernet traffic.
Step 8
At the source node, connect an Ethernet test set to the source port and configure the test set to send and
receive the appropriate Ethernet traffic.
Step 9
Transmit Ethernet frames between both test sets. If you cannot transmit and receive Ethernet traffic
between the nodes, repeat Steps
through
to make sure you configured the Ethernet ports and test set
correctly.
Step 10
Perform protection switch testing appropriate to the SONET topology:
•
For path protection configurations, complete the
“DLP-A94 Path Protection Switching Test” task on
.
•
For BLSRs, complete the
“DLP-A91 BLSR Switch Test” task on page 17-87
.
Configure your test set according to local site practice. For information about configuring your test set,
see your test set user guide.
Step 11
Complete the
“DLP-A230 Change a Circuit Service State” task on page 19-19
circuit ports to the IS-NR service state.
Step 12
After the circuit test is complete, print the results or save them to a disk for future reference. For
information about printing or saving test results, see your test set user guide.
Stop. You have completed this procedure.
NTP-A304 Provision CE-100T-8 Ethernet Ports
Purpose
This task provisions CE-100T-8 Ethernet ports to carry traffic.
Tools/Equipment
None
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...