17-37
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 17 DLPs A1 to A99
DLP-A30 Install Ferrites to Power Cabling
Caution
When routing the long UBIC-H combination 735/734 cables, do not stretch or force them by pulling on
one end. They must be properly laid into the cable racks to prevent the splices from being broken or
shorted.
Note
SMB EIAs feature cable-management eyelets for tie wrapping or lacing cables to the cover
panel.
Step 3
Return to your originating procedure (NTP).
DLP-A30 Install Ferrites to Power Cabling
Step 1
Wrap the cables once around and through the block ferrites and pull the cables straight through the oval
ferrites.
Step 2
Place the oval ferrite as close to the power terminals as possible, between the ONS 15454 and the block
ferrite, as shown in
. The block ferrite should be within 5 to 6 inches (127 to 152 mm) of
the power terminals.
Figure 17-18
Attaching Block and Oval Ferrites to Power Cabling
Step 3
Return to your originating procedure (NTP).
Purpose
This task attaches ferrites to power cabling. Use a single oval ferrite
(TDK ZCAT2035-0930) and a single block ferrite (Fair Rite 0443164151)
for each pair of cables (BAT1/RET1 [A] and BAT2/RET2[B]).
Tools/Equipment
Oval and block ferrites
Prerequisite Procedures
None
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Power terminals
32087
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...