Contents
vi
Cisco 6260 Hardware Installation Guide
OL-2365-02
4.2.2 Attach Ear Brackets to the Cisco 6260
4-4
4.2.3 Install the Cisco 6260 Chassis
4-5
4.2.4 Install Blank Faceplates
4-6
4.2.5 Ground the Cisco 6260
4-7
4.2.6 Connect the Cisco 6260 to the MDF
4-8
4.2.7 Attach Cisco 6260 Power Connections
4-9
4.2.8 Connect the Alarm and BITS Clock Contacts
4-12
4.2.9 Apply Power
4-13
4.2.10 Verify Fan Tray Operation
4-14
4.2.11 Connect the Cisco 6260 System to the Network
4-14
4.2.11.1 E3 Network Connection
4-14
4.2.11.2 E1 Network Connection
4-15
4.2.11.3 OC-3c Network Connection
4-16
4.2.12 Install a Subtended Network Configuration
4-17
4.2.12.1 Connect the E3 Subtending Network Configuration
4-17
4.2.12.2 Connect the E1 Subtending Network Configuration
4-18
4.2.12.3 Connect the OC-3c Subtending Network Configuration
4-19
4.2.13 Connect the Ethernet to the Management Network
4-19
4.2.14 Connect a Console Terminal
4-20
4.2.15 Connect the Auxiliary Port
4-20
4.2.16 Complete Initial Configuration
4-21
4.2.16.1 Before You Begin
4-21
4.2.16.2 Using the System Configuration Dialog
4-21
C H A P T E R
5
Troubleshooting
5-1
5.1 Hot-Swappable FRUs
5-1
5.2 Basic Checks
5-2
5.3 Contacting the Cisco TAC for Help
5-2
5.4 System-Wide Problems
5-3
5.5 FRU-Specific Problems
5-8
5.5.1 NI-2 Card Problems
5-8
5.5.2 NI-2 Card Redundancy Problems
5-9
5.5.3 Line Card Problems
5-10
5.5.4 I/O Module Problems
5-14
5.5.5 Fan Tray Problems
5-15
5.5.6 PEM Problems
5-16
5.6 Alarms
5-17