4-2
Cisco 6260 Hardware Installation Guide
OL-2365-02
Chapter 4 Installing a Cisco 6260 Without a POTS Splitter Configuration
Installation Checklist
4.1 Installation Checklist
When you install a Cisco 6260 without a POTS splitter configuration, be sure that you follow the
installation procedures in the proper sequence.
Table 4-1
is a checklist of the installation steps in the
order in which they should occur. Detailed installation instructions are located in the sections following
Table 4-1
.
Caution
Proper ESD protection is required whenever you handle Cisco equipment. Installation and maintenance
personnel should be properly grounded using ground straps to eliminate the risk of ESD damage to the
equipment. Cards are subject to ESD damage whenever they are removed from the chassis.
4.2 Installation Procedures
The following sections detail the installation procedures for a Cisco 6260 without a POTS
splitter configuration.
4.2.1 Measure Rack Space
For the rack to remain stable, you must install your Cisco 6260 system from the bottom to the top of the
rack.
Table 4-1
Installation Checklist—Cisco 6260 without a POTS Splitter Configuration
Check
Installation Procedure
1.
Measure the rack space.
2.
Attach Cisco 6260 ear brackets.
3.
Install the Cisco 6260 chassis in the rack.
4.
Install the blank faceplates in the open slots.
5.
Ground the Cisco 6260.
6.
Connect the Cisco 6260 chassis to the MDF
1
.
1.
MDF = main distribution frame
7.
Attach the Cisco 6260 power connections.
8.
Connect the alarm and BITS clock contacts.
9.
Apply power to the system.
10.
Verify that the fan trays are operational.
11.
Connect the Cisco 6260 system to the network.
12.
Install a subtended network configuration (optional).
13.
Connect the ethernet to the management network.
14.
Connect a console terminal.
15.
Connect the auxiliary port (optional).
16.
Complete the initial configuration.