3-5
Cisco 6260 Hardware Installation Guide
OL-2365-02
Chapter 3 Installing a Cisco 6260 with a POTS Splitter Configuration
Installation Procedures
3.2.4 Install the Cisco 6260 Chassis
Complete the following steps to install the Cisco 6260 chassis.
Warning
Two people are required to lift the chassis. Grasp the chassis underneath the lower edge and lift with
both hands. To prevent injury, keep your back straight and lift with your legs, not your back.
Step 1
Connect a grounding strap to the ESD grounding jack that is located on the top right of the front of the
Cisco 6260 chassis.
Step 2
Using a Phillips-head screwdriver, attach the two mounting aids to the rack above the third-party POTS
splitter. Use two screws for each mounting aid, as shown in
Figure 3-2
. The lower edge of the mounting aid
lines up with the bottom of the chassis.
Figure 3-2
Screw the Mounting Aids to the Rack
26877