
3-8
Cisco 6260 Hardware Installation Guide
OL-2365-02
Chapter 3 Installing a Cisco 6260 with a POTS Splitter Configuration
Installation Procedures
Figure 3-4
System Ground Connection
Step 10
Insert the screws
through the holes in the lug and the chassis. Use the Phillips-head screwdriver to tighten
the screws and secure the grounding lug firmly to the chassis.
Step 11
Prepare the other end of the grounding wire and connect it to an appropriate grounding point in your site.
Step 12
Repeat
Step 1
through
Step 11
for each Cisco 6260 chassis, as necessary.
3.2.7 Ground the Third-Party POTS Splitter
Refer to the appropriate vendor documentation for grounding procedures for the third-party
POTS splitter.
Note
Do not ground the components in a rack by chaining them together.
26677
Cisco 6260
ATU-C 1
ACTIVE
STATUS
ATUC-1
-4DMT
ATU-C 2
ATU-C 3
ATU-C 4
ATU-C 1
ACTIVE
STATUS
ATUC-1
-4DMT
ATU-C 2
ATU-C 3
ATU-C 4
ATU-C 1
ACTIVE
STATUS
ATUC-1
-4DMT
ATU-C 2
ATU-C 3
ATU-C 4
ATU-C 1
ACTIVE
STATUS
ATUC-1
-4DMT
ATU-C 2
ATU-C 3
ATU-C 4
ATU-C 1
ACTIVE
STATUS
ATUC-1
-4DMT
ATU-C 2
ATU-C 3
ATU-C 4
ATU-C 1
ACTIVE
STATUS
ATUC-1
-4DMT
ATU-C 2
ATU-C 3
ATU-C 4
Grounding
lug
Grounding
holes in
side of
chassis
60V
1 A MAX
PEM 1/PEM 2
AUD_CRIT/AUD_MAJ
AUD_MIN/VIS_CRIT
VIS_MAJ/VIS_MIN
STAT_ALARMS
BUS_A/BITS_B