F. Secondary Transfer Roller
1) Open the ITB unit drawer.
2) Shift the secondary transfer roller
removal lever toward you.
3) Holding the gear, slide the secondary
transfer roller to the right to remove.
➀
Secondary transfer roller removal lever
➁
Gear
➂
Secondary transfer roller
Figure 3-4-7
< Note for reassembly >
When installing a new secondary transfer
roller, make sure not to touch the sponge
area of the roller.
Figure 3-4-8
G. Upper Thermoswitch
1) Unhook the 2 claws and remove the fix-
ing cover 1.
➀
Claws
➁
Fixing cover 1
Figure 3-4-9
2) Remove the 3 screws and then the
upper thermoswitch.
➀
Screws
➁
Upper thermoswitch
Figure 3-4-10
3 - 24
CHAPTER 3
➁
➀
➂
Shaft
Shaft
Sponge
➁
➀
➀
➁
➀
Summary of Contents for CLBP-460PS
Page 10: ......
Page 58: ......
Page 170: ......
Page 252: ......
Page 254: ......
Page 324: ...BLANK PAGE 4 70 CHAPTER 4 ...
Page 326: ...BLANK PAGE 4 72 CHAPTER 4 ...
Page 334: ......
Page 336: ......
Page 360: ......
Page 362: ......
Page 376: ......
Page 384: ......
Page 405: ......
Page 408: ......
Page 411: ......
Page 417: ......
Page 420: ......
Page 424: ......
Page 430: ......
Page 431: ......
Page 438: ......
Page 440: ......
Page 441: ......
Page 444: ......
Page 446: ......
Page 452: ......
Page 473: ......
Page 477: ......
Page 481: ......
Page 501: ......
Page 524: ......
Page 540: ......
Page 550: ......
Page 552: ......
Page 554: ......
Page 556: ......
Page 558: ......