3-38
Confidential
3) First fit the front end of the Head/carriage unit over the CR frame and then set the
rear end onto the CR guide rail.
Make sure that the two points (see figure below) on the front side of the Head/
carriage unit bottom are firmly hooked to the front end of the CR frame and that the
bosses of the bottom rear side are properly fitted into the two notches of the CR
guide rail (refer to
).
4) Attach the encoder lock. Make sure that the encoder lock latch is under the encoder.
5) Slide the Head/carriage unit by hand to check if it moves smoothly.
6) Release the bound CR timing belt and attach it to the Idle pulley on the left edge
first. Then, while pressing the Idle pulley holder to the right, attach the belt to the
Carriage motor pulley on the right edge. (Refer to
)
7) Slide the Head/carriage unit by hand to check that it smoothly moves to the right and
left ends of its travel.
(3_033L)
Bottom view
Bottom rear side bosses
Hook
Hook
Head/carriage unit
(3_034L)
Encoder lock
Encoder
Summary of Contents for DCP Series
Page 111: ...3 3 Confidential 2 PACKING For Ink Cartridge Model 3_002L ...
Page 112: ...3 4 Confidential For Ink Tank Model 3_002L 1 ...
Page 119: ...3 11 Confidential 2 CIS flat cable 3_006L CIS flat cable Cable guide Cable guide Flat core ...
Page 234: ...5 12 Confidential Scanning Compensation Data List ...
Page 236: ...5 14 Confidential Test Pattern ...
Page 240: ...5 18 Confidential Configuration List ...
Page 256: ...5 34 Confidential pfadj1 Pattern pfadj2 Pattern ...
Page 264: ...5 42 Confidential Margin Check Pattern ...
Page 294: ...6 3 Confidential Power supply PCB 100 V series ...
Page 295: ...6 4 Confidential Power supply PCB 200 V series ...
Page 309: ...App 3 8 Confidential When the following screen appears click Close to close the screen ...