Establishing an Ethernet connection to the Brocade DCX 8510-8............... 39
Customizing a switch name.......................................................................... 40
Customizing a chassis name........................................................................ 40
Setting the domain ID....................................................................................40
Setting the date and time.............................................................................. 41
Setting the date.................................................................................41
Setting the time zone........................................................................ 41
Synchronizing local time................................................................... 42
blades..........................................................................................44
Installing QSFP transceivers and cables.......................................... 45
Managing cables...........................................................................................46
Verifying correct operation and backing up the configuration....................... 47
Powering off the Brocade DCX 8510-8.........................................................48
Monitoring overview...................................................................................... 49
Determining the status of a port or application blade....................................54
Blade illustrations..............................................................................54
Determining the status of a control processor blade (CP8).......................... 65
Determining the status of a core switch blade (CR16-8).............................. 67
Determining the status of a power supply.....................................................69
Determining the status of a blower assembly............................................... 70
Determining the status of a WWN card.........................................................72
Introduction................................................................................................... 75
ESD precautions........................................................................................... 75
Chassis door removal and replacement....................................................... 76
Time and items required................................................................... 76
Removing a chassis door..................................................................76
Replacing a chassis door..................................................................77
Cable management comb removal and replacement................................... 77
Time and items required................................................................... 77
Removing a cable management comb..............................................77
Replacing a cable management comb..............................................78
Port, application, and encryption blade removal and replacement............... 78
Time and items required................................................................... 79
Removing a blade............................................................................. 80
Replacing a blade............................................................................. 81
Blade filler panel removal and replacement..................................................82
Removing a filler panel......................................................................82
Replacing a filler panel......................................................................83
Control processor blade (CP8) removal and replacement............................84
Time and items required................................................................... 84
Faulty CP blade indicators................................................................ 84
Recording critical Brocade DCX 8510-8 information........................ 85
Removing a control processor blade (CP8)...................................... 86
Replacing a control processor blade (CP8)...................................... 87
Verifying operation of the new CP blade...........................................88
Completing the replacement............................................................. 91
Core switch blade (CR16-8) removal and replacement................................ 92
4
Brocade DCX 8510-8 Backbone Hardware Reference Manual
53-1002180-08
Summary of Contents for DCX 8510-8
Page 1: ...53 1002180 08 19 September 2014 Brocade DCX 8510 8 Backbone Hardware Reference Manual ...
Page 22: ...Network manageability 22 Brocade DCX 8510 8 Backbone Hardware Reference Manual 53 1002180 08 ...
Page 34: ...Installing ICL cables 34 Brocade DCX 8510 8 Backbone Hardware Reference Manual 53 1002180 08 ...
Page 172: ...Danger Notices 172 Brocade DCX 8510 8 Backbone Hardware Reference Manual 53 1002180 08 ...