53-1004106-15 Installation Guide
Brocade
®
X6-4 Director Hardware Installation Guide
2. Ensure the chassis can be oriented so that the nonport side has access to intake air (cool).
3. If applicable, lock the wheels of the lift.
4. Use a lift to raise the chassis to the correct level.
5. Gently slide the chassis onto the rack, ensuring that it remains supported during the transfer.
Figure 25: Installing a Chassis into the Equipment Rack
53-1004106-15
49
Summary of Contents for Brocade X6-4
Page 208: ......