53-1004106-15 Installation Guide
Brocade
®
X6-4 Director Hardware Installation Guide
Revision History
53-1004106-15; 18 March 2022
Added support for the CPX control processor blade.
53-1004106-14; 15 December 2021
Moved the copyright statement to the end of the document and made other editorial changes.
53-1004106-13; 23 April 2021
•
Removed the Parts List - NEBS Kit section.
•
WWN Card Replacement Task Guide
•
•
chapter.
•
53-1004106-12; 27 June 2019
•
Deleted the "Removing the Logo Bezel Protective Cover" section.
•
Clarified the procedure to chassis-ground the Brocade X6-4 Director in the
chapter.
53-1004106-11; 14 December 2018
•
Editorial and stylistic changes.
•
Replaced the "About This Document" chapter with the "Introduction" chapter.
•
Added a bullet item to
to resolve the issue of 16G QSFPs sometimes negotiating link
speed to 8G when connecting a breakout cable.
•
Added a table of LED descriptions for 10/100/1000Mb/s Ethernet ports in
that define LED
operation for 10, 100, and 1000Mb/s link speeds.
•
Added power (Watts) and heat dissipation (Btu/hr) measurements to power consumption tables for AC and HVAC/
for a director with FC32-64 blades installed.
53-1004106-15
205
Summary of Contents for Brocade X6-4
Page 208: ......