
X
Position controller
Com
PLC communication task
rLoad
Used calculating time
rFreeTime
Remaining unused calculating time
Fig. 4-18:
Task runtime measurement, "underload"
The above figure shows a measurement of a task with a periodic time of
t#2ms. The task only uses a small part of the calculating time. Note that the
100% mark corresponds to the total calculating time available for this task.
The calculating time actually used is compared to the 100% time and dis‐
played as percentage value at the "rLoad" output. The remaining unused cal‐
culating time is displayed as a time value at the "rFreeTime" output in µs.
X
Position controller
Com
PLC communication task
rLoad
Used calculating time
rFreeTime
Remaining unused calculating time
Fig. 4-19:
Task runtime measurement, "overload"
Bosch Rexroth AG
DOK-INDRV*-MLD3-**VRS*-AP02-EN-P
68/267
Rexroth IndraDrive Rexroth IndraMotion MLD (2G) as of MPx-18
Basic functions of Rexroth IndraMotion MLD
LSA Control S.L. www.lsa-control.com [email protected] (+34) 960 62 43 01