724-746-5500 | blackbox.com
Page 19
Chapter 3: Installation
4. Close the core and snap the halves back together.
Figure 3-13. Close core.
5. Connect the Ethernet cable with suppression core to the “Data In” port of the PoE injector.
Figure 3-14. Connecting cable to data-in port.