724-746-5500 | blackbox.com
Page 18
Chapter 3: Installation
3.4.5 Connect to the Extender
To be able to configure and manage the extender, do the following:
1. Open the ferrite core by unsnapping the connector latches. The core will open, revealing a concave surface.
Figure 3-10. Open the connector latches.
2. Lay the Ethermet cable into the core, usually within 2 to 3 inches of the connector.
Figure 3-11. Putting cable into the core.
3. Loop the cable around and through the core. This helps “lock” the core in place, and may be required in circumstances with
severe interference.
Figure 3-12. Loop cable around core.