5. ICMP service procedure
Image 5-10
5. Switch on the projector.
In case you replace one HDD (e.g. degraded mode) the ICMP automatically starts with
the RAID recovery process. The red LED of the HDD which has to be rebuilt is blinking.
This process takes about 200 GB per hour. Once the RAID is completed the red LED
turns off.
C
AUTION
:
It’s strongly recommended to complete the RAID recovery process prior to
starting a show. This to ensure that the content integrity is preserved and that the show
is not interrupted.
5.5
Replacement of the battery
What has to be done? (procedure overview)
Once the ICMP card is removed from the projector (see ICMP installation Manual), you must:
•
Remove the cover from the battery slot.
•
Insert the new battery in the empty slot.
•
Remove the old battery.
•
Replace the cover.
•
Write the insertion date (MM/YY) on the sticker.
C
AUTION
:
Danger of explosion when replaced with wrong type of battery. Replace
the battery only with a 3V Lithium battery which has the same CR2477N (Barco Ref.
[P222004]) or equivalent type recommended by Barco.
C
AUTION
:
Always leave a working battery on the ICMP card. Removing all the batteries
at the same time will cause immediate failure of the card and the only way to recover the
functionality of the card is the return it to the manufacturer.
Necessary tools
•
Insulated
fl
at blade screwdriver (not included in the replacement kit that Barco offers).
•
Pen to write the date on the sticker (not included in the replacement kit that Barco offers).
•
2 Tamper evident stickers (not included in the replacement kit that Barco offers for security reasons).
•
5 cm of plastic (insulating) tube (Supplied in the replacement kit).
•
Pair of insulating gloves (Supplied in the replacement kit).
R5906594 ICMP 09/11/2016
73
Summary of Contents for ICMP
Page 1: ...ICMP Service Manual DP Alchemy R5906594 05 09 11 2016 ...
Page 4: ......
Page 6: ...Table of contents 2 R5906594 ICMP 09 11 2016 ...
Page 18: ...2 General 14 R5906594 ICMP 09 11 2016 ...
Page 20: ...3 Preventative maintenance actions 16 R5906594 ICMP 09 11 2016 ...
Page 70: ...4 Troubleshooting 66 R5906594 ICMP 09 11 2016 ...
Page 88: ...5 ICMP service procedure 84 R5906594 ICMP 09 11 2016 ...