0
AX-4030
AUTION MAX AX-4030 OPERATING MANUAL
G
Table of Contents
Premise .......................................................................... 3
Introduction ..................................................................... 4
Symbols ..........................................................................
Caution Labels................................................................
Table of Contents ......................................................... 0
Chapter 1
Before Use
1.1 Outline of the AX-4030 .......................................1-2
.. What You Can Do with the AX-4030 ................-
.. Features ...........................................................-3
..3 Specifications ..................................................-
..4 Measurement Principle ....................................-
.. Rank Table .....................................................-
1.2 Unpacking .........................................................1-13
.. Instrument ......................................................-3
.. Sampler ..........................................................-3
..3 Accessories ....................................................-4
..4 Accessory Case .............................................-
1.3 Components ......................................................1-16
.3. Front View ......................................................-
.3. Rear View .......................................................-7
1.4 Installation.........................................................1-18
.4. Precautions in Instrument Installation ............-8
.4. Unlocking the Instrument ...............................-0
.4.3 Attaching the Sampler ....................................-3
.4.4 Installing the Washing Solution Bottle ............-
.4. Installing the Drain Bottle ...............................-8
.4. Installing the Waste Box .................................-9
.4.7 Connecting the Power Cord and
External Devices ............................................-30
1.5 Starting Up ........................................................1-31
.. Turning On the Power for the First Time ........ -3
.. Setting up the Printer and System Clock ....... -33
..3 Turning Off the Power ....................................-34
1.6 Relocation .........................................................1-35
.. Precautions in Instrument Relocation ............-3
.. Checking for Leftover Test Strips ...................-3
..3 Discharging the Washing Solution .................-3
..4 Unplugging the Power Cord ...........................-3
.. Disconnecting the Tubes,
Sensor Code, and Cables ..............................-37
.. Detaching the Sampler ...................................-38
..7 Relocating the Instrument ..............................-39
1.7 Basic Operations ..............................................1-40
.7. Components on the Operator Panel ..............-40
.7. Screen Configuration .....................................-4
.7.3 Menu Operations and Examples ....................-4
Chapter 2
Measurement
2.1 Before Making Measurements...........................2-2
.. Flowchart of Operational Procedure ................-
.. Measurement and Calibration ..........................-3
..3 Measurement Terminology ..............................-4
..4 Sample Containers and Sample Racks ........... -7
2.2 Measurement Precautions .................................2-9
.. Handling the Instrument ...................................-9
.. Handling Samples ..........................................-0
..3 Handling Test Strips .......................................-
2.3 Preparation for Measurement..........................2-12
.3. Checking Wastes and Consumables .............-
.3. Turning on the Power .....................................-4
.3.3 Loading Test Strips into the Feeders .............-
.3.4 Assigning the Type of Test Strips
to the Item Racks ...........................................-9
.3. Preparing Samples .........................................-
2.4 Measurement Operations ................................2-23
.4. Normal Measurement:
Measuring Samples Continuously ..................-3
.4. Port STAT Measurement:
Measuring a Higher Priority Sample ..............-7
.4.3 Rack STAT Measurement:
Measuring Higher Priority Samples ................-3
2.5 S.G. Calibration.................................................2-34
.. Preparing S.G. Standard Solutions ................-34
.. Starting S.G. Calibration ................................-3
2.6 Control Measurement.......................................2-38
2.7 Check Measurement.........................................2-43
2.8 Displayed and Printed Reports .......................2-49
.8. Displayed Results Report ...............................-49
.8. Printed Results Report ...................................-0
.8.3 Abnormal Results List ....................................-4
Summary of Contents for AUTION MAX AX-4030
Page 1: ......
Page 57: ...1 46 AX 4030 AUTION MAX AX 4030 OPERATING MANUAL ...
Page 115: ...2 58 AX 4030 AUTION MAX AX 4030 OPERATING MANUAL ...
Page 181: ...4 38 AX 4030 AUTION MAX AX 4030 OPERATING MANUAL ...
Page 205: ......
Page 206: ......