background image

 www.eaton.com

Power Xpert

®

 Meter 4000/6000/8000

Quick Start Guide

Instruction Booklet IB02601007E

Effective January 2017
Supercedes January 2012

Summary of Contents for Power Xpert PXM 4000

Page 1: ...www eaton com Power Xpert Meter 4000 6000 8000 Quick Start Guide Instruction Booklet IB02601007E Effective January 2017 Supercedes January 2012...

Page 2: ...on experience and judgment and may not cover all contingencies If further information is required an Eaton sales office should be consulted Sale of the product shown in this literature is subject to t...

Page 3: ...ing to a Meter Using the Embedded Web Server Interface 12 2 9 Programming the Meter via the Optional Communications Expansion Card 13 3 Mounting and Wiring 17 3 1 Mounting the Meter and Displays 17 3...

Page 4: ......

Page 5: ...t before attempting to install or operate the equipment Improper wiring could cause death injury and or equipment damage Only qualified personnel are to service the Power Xpert Meter TROUBLESHOOTING P...

Page 6: ...Page 6 IB02601007E www eaton com 1 Introduction...

Page 7: ...XIMITY TO EXPOSED ENERGIZED LIVE ELECTRICAL WIRING AND OR PARTS WHERE THE HAZARD OF FATAL ELECTRIC SHOCK IS PRESENT Exercise extreme care to avoid injury or death Always disconnect lock out and tag th...

Page 8: ...dc Fabricate a power cord of suitable length to connect PS1 1 PS1 2 PS1 3 refer to Figure 1 to a suitable Power Source that supplies 100 240 Vac or 110 250 Vdc Power LED should be solid blue ON Health...

Page 9: ...ID Password re quired ADMIN ADMIN accepted for 15 minutes after boot up OFF ON ON is Normal OFF is Safe Mode Medium Security Energy Demand resets prohibited ON OFF ON is Normal OFF is Safe Mode High...

Page 10: ...nstallation Manual IM02601004E for more information 2 5 Base Address The Power Xpert Meter has a rotary Base Address switch on the bottom left side of the meter This rotary switch is for use with the...

Page 11: ...polarity mark 12 return Line 2 CT connected to Terminals 21 polarity mark 22 return Line 3 CT connected to Terminals 31 polarity mark 32 return Neutral CT connected to Terminals 41 polarity mark 42 r...

Page 12: ...lowing steps Click Window s Start Then click Settings Navigate to the Control Panel of your computer In Control Panel click Network and right click Local PC Area Connection Select Properties from the...

Page 13: ...ips with CE2 enabled for DHCP Once connected to the Lo cal Area Network supporting DHCP an IP will be assigned this may require a power cycle to the PXM4 6 8K Once energized the PXMCE CE1 CE2 port LED...

Page 14: ...ome Page will be displayed If DHCP is enabled the user must find the IP address via the Local Configuration port Setup Diagnostics Communication Ethernet Status or Local Display 2 Enter the Username a...

Page 15: ...ovides communication via Modbus RTU CE3 CE4 see the User and Installation manual IM02601004E for Mod bus instructions The RS485 CE3 port supports Modbus RTU slave to a master monitor ing system The po...

Page 16: ...Page 16 IB02601007E www eaton com 2 Quick Start Guide for the Meter...

Page 17: ...n website www eaton com meters 3 To mount the 12 inch advanced color touchscreen display see TD150019EN available on the Eaton website www eaton com meters 4 To mount the 6 inch display and the Meter...

Page 18: ...er selection of any required current transformers or potential transformers is critical to the proper and accurate functioning of the Power Xpert Meter Instrumentation grade devices are required Short...

Page 19: ...02601007E Page 19 3 Mounting and Wiring Figure 7 3 Phase 3 Wire Delta Up to 480 Volts Direct Voltage and External Current Transformers Figure 8 3 Phase 3 Wire Delta Up to 480 Volts External Voltage an...

Page 20: ...aton com 3 Mounting and Wiring Figure 9 3 Phase 3 Wire Delta Up to 480 Volts 2 CTs External Voltage and External Current Transformers Figure 10 3 Phase 4 Wire Y Up to 600 Volts Direct Voltage and Exte...

Page 21: ...RE DAMAGE TO THE METER CAN RESULT 3 6 Communication Wiring The Power Xpert Meter PXM 4000 6000 8000 has inverted terminal blocks for CM4 the 24V Auxiliary I O Power and CM6 These inverted terminal blo...

Page 22: ...62 5 m 100 M 2 1 1 na NO NO NO CE2 LAN WAN 10 100 T RJ45 328 492 ft 100 150 m CAT5 Shielded Twisted Pair UTP 100 M 2 1 1 na NO NO NO CM1 Local Con figuration 10 100 T RJ45 98 ft 30 m CAT5 Shielded Tw...

Page 23: ...commended to minimize problems with frayed wires and to strengthen the terminal block con nection when daisy chaining wires use a dual wire ferrule Phoenix Contact and many other vendors carry ferrule...

Page 24: ...Page 24 IB02601007E www eaton com 3 Mounting and Wiring...

Page 25: ...te Output 2 IO3 3 Electro mechanical Relays rated for 240 VAC 30 VDC 5 Amps IO31 R1A Form A Contact Relay1 IO32 R1C Common Relay 1 IO33 R1B Form B Contact Relay 1 IO34 R2A Form A Contact Relay2 IO35 R...

Page 26: ...play Cleaning instructions If the meter or display require cleaning the power and metering inputs should be turned off through their disconnects The meter and display should be cleaned with a dry clea...

Page 27: ...NOTES www eaton com IB02601007E Page 27 4 Ratings...

Page 28: ...44122 United States 877 ETN CARE 877 386 2273 Eaton com 2017 Eaton All Rights Reserved Printed in USA Publication No IB02601007E TBG001350 January 2017 Power Xpert Meter 4000 6000 8000 Quick Start Gui...

Reviews: