2. Quick Start Guide for the Meter
2.4. Com Reset Switch
Located above the rotary switch, the Com Reset switch can be used in conjunction with
the DIP switches on the power supply front panel to reset the meter’s communications
ports. The reset switch has the following functions, depending on the DIP switch settings.
DS -1 DS-2
DS-3
OFF
OFF
ON
Initialize all communications ports to their
factory default settings.
OFF
ON
ON
Initialize the LAN/WAN and Local Config
communications ports and assign the fol-
lowing IP addresses:
LAN/WAN: 10.1.1.1
Local Config: 192.168.1.1
ON
OFF
ON
Attempt to recover communications via
the LAN/WAN port by disabling then re-
enabling the communications port.
ON
ON
ON or
OFF
Factory Test Mode - The meter should
never be operated in this mode. The
meter will indicate that it’s in factory test
mode through a repeating series of three
flashes on the
red
Status LED.
Refer to the User and Installation Manual (IM02601004E) for more information.
2.5. Base Address
The Power Xpert Meter has a rotary Base Address switch on the bottom-left side of the
meter. This rotary switch is for use with the obsolete PXD-MMG on COM0 and does not
apply to COM1, COM2, or COM3.
2.6. VT , VX, and CT Connections
Planning CT and VT Connections (Figure 3)
Determine your wiring requirements for the meter. This quick start guide will cover these
basic wiring configurations:
• 3-Phase, 3-Wire Delta( Up to 600 V L-L, 347 L-N) 3 CTs
• 3-Phase, 3-Wire Delta (Above Up to 600 V L-L, 347 L-N) 3 CTs
• 3-Phase, 3-Wire Delta (Above Up to 600 V L-L, 347 L-N) 2 CTs
• 3-Phase,4-Wire Y (Up to Up to 600 V L-L, 347 L-N)
• 3-Phase,4-Wire Y (Above Up to 600 V L-L, 347 L-N)
See Wiring Diagrams in this manual for examples of CT and PT connections.
VT Terminal Voltage Connections:
Voltage Inputs can accept up to 600 Vac L:L / 347VL:G direct. A PT with a 120 V second-
ary is required if this rating is exceeded. Primary settings are 120-500,000, for a PT ratio
of 120:120 to 500000 to 120. It is strongly recommended that the Voltage Inputs be con-
nected to the Meter by way of properly rated disconnect switches.