Chapter 7: Installing the AT-SBx81CFC960 Control Card and Ethernet Line Cards
140
Section II: Installing the Chassis
Allied Telesis recommends tightening the screws to 5 inch-lbs.
4. Repeat this procedure to cover the remaining empty slots with blank
slot covers.
5. Store any unused blank panels in a secure location for future use.
6. Go to Chapter 8, “Installing the Transceivers and Cabling the Ports” on
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...