Chapter 8: Installing the Transceivers and Cabling the Ports
146
Section II: Installing the Chassis
Installing SFP Transceivers in the AT-SBx81GS24a Line Card
Please review the information in “Guidelines to Installing SFP and SFP+
Transceivers” on page 145 before performing this procedure.
To install SFP transceivers in AT-SBx81GS24a Line Cards, perform the
following procedure:
1. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
2. Remove the dust cover from the SFP slot chosen for the transceiver.
Figure 77 shows the dust cover being removed from slot 1..
Figure 77. Removing the Dust Cover from an SFP Slot in the AT-
SBx81GS24a Line Card
3. To install the transceiver in an SFP slot on the top row of the line card,
orient the transceiver with the handle on top, as shown in Figure 78.
To install it into a slot on the bottom row of the line card, orient it with
the handle on the bottom.
Figure 78. Handle on SFP Transceiver
Handle
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...