SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
101
Removing the Shipping Brace
Now that the chassis is installed in the equipment rack, you may remove
the shipping brace from the front of the unit. To remove the shipping brace,
remove the six mounting screws with a #2 Phillips-head screwdriver (not
provided). Refer to Figure 35.
Figure 35. Removing the Shipping Brace
After removing the shipping plate, go to “Installing the Chassis Grounding
Wire” on page 102.
Shipping Brace Screws
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...