21
Chapter 1
Chassis and Power Supplies
This chapter describes the Layer 3+ SwitchBlade x8112 Chassis Switch in
the following sections:
“AT-SBx8112 Chassis” on page 22
“Slots for the Ethernet Line and Controller Cards” on page 25
“Power Supplies and Power Supply Slots” on page 26
“AT-SBxFAN12 Module” on page 31
“Power Supply Interfaces (Opto-couplers)” on page 32
Note
This version of the installation guide applies to release 5.4.5-1 of the
AlliedWare Plus
™
Operating System for the SwitchBlade x8112
Chassis Switch and AT-SBx81CFC960 Controller Fabric Card.
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...