SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
113
Installing AT-SBxPWRPOE1 PoE Power Supplies
This section contains the installation procedure for the AT-SBxPWRPOE1
Power Supply, for the PoE+ ports on the AT-SBx81GP24 PoE Line Card.
For background information, refer to “Power Supplies and Power Supply
Slots” on page 26.
Caution
The electronic components in the power supply can be damaged by
electro-static discharges (ESD). Follow the procedure in “Protecting
Against Electrostatic Discharge (ESD)” on page 106 to guard
against ESD damage when unpacking and installing the power
supply.
To install the power supply, perform the following procedure:
1. Choose a slot for the AT-AT-SBxPWRPOE1 System Power Supply in
the chassis.
You may install it in either slot A or B, shown in Figure 41 on page 108.
2. Raise the handle on the blank panel covering the selected slot and
slide the panel from the chassis. Figure 47 on page 114 illustrates the
removal of the blank panel from slot A.
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...