Chapter 9: Powering On the Chassis
176
Section II: Installing the Chassis
Figure 107. Securing the Power Cord for the AT-SBxPWRSYS1 or AT-
SBxPWRSYS2 AC Power Supply to an Anchor
4. Connect the power cord to an appropriate AC power source to power
on the power supply.
5. If the chassis has two AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC
System Power Supplies, repeat this procedure to power on the second
power supply.
After powering on the AC system power supplies, do one of the follow:
If the chassis has AT-SBxPWRPOE1 PoE Power Supplies,
perform the procedure in “Powering On AT-SBxPWRPOE1 Power
Supplies” on page 177.
Otherwise, go to “Monitoring the Initialization Process” on
page 206.
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...