Chapter 8: Installing the Transceivers and Cabling the Ports
152
Section II: Installing the Chassis
Figure 86. Removing the Dust Cover from an SFP+ Transceiver in the AT-
SBx81XS6 Line Card
Note
The dust cover protects the fiber optic port on the SFP transceiver
from dust contamination. It should not be removed until you are
ready to connect the fiber optic cable.
5. Before connecting the cable, verify the position of the handle on the
SFP+ transceiver. The handle should be in the up position, as shown
in Figure 87.
Figure 87. Verifying the Position of the Handle on the SFP+ Transceiver in
the AT-SBx81XS6 Line Card
Handle
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...