94
Installation, Operation, and Maintenance
Part 2, Operation
4
Controlling the Sampler
Setting Parameters on a 6850 Series GC
To set injection parameters
1
Display this screen.
Status / Automation / Injector
2
Enter:
Plunger Pumps
—The number of times to pump the plunger with the
needle in the sample to expel bubbles before drawing up the measured
sample amount.
Sample Size
—The amount to be injected. The choices depend on the
syringe size specified during setup.
Viscosity Delay
—The number of seconds the plunger pauses at the top
of the pump and inject strokes. This time allows viscous samples to flow
into the vacuum created by the plunger.
Slow plunger
—Reduces the plunger speed during injection from normal
(about 100 µL/s with a 10 µL syringe) to about 5 µL/s.
Summary of Contents for agilent 7683B
Page 10: ...10 Installation Operation and Maintenance...
Page 18: ...18 Installation Operation and Maintenance...
Page 70: ...70 Installation Operation and Maintenance Part 1 Installation 2 Installation...
Page 72: ...72 Installation Operation and Maintenance...
Page 128: ...128 Installation Operation and Maintenance Part 2 Operation 6 Vials and Bottles...
Page 202: ...202 Installation Operation and Maintenance A Cables and Connectors...