Installation
2
Installation, Operation, and Maintenance
61
Part 1, Installation
Procedure 10. Installing a G2612A Controller Board (6890 Plus)
The G2612A ALS Interface board must be present in a 6890 Plus GC to operate
the 7683B Automatic Liquid Sampler. The GC must have a serial number
greater than 20,000.
Follow this procedure to install the G2612A ALS Interface board.
1
Remove the GC rear panels and the right side cover.
2
Hold the board upright and slightly angled as shown in
3
Place the board onto the mounting bracket.
4
Slide it into the bracket until the cutouts in the board are aligned with the
locking tabs in the bracket.
5
Lay the board against the chassis then slide it in until it stops. The locking
tabs should hold the board in place.
WA R N I N G
Before proceeding, turn off the main power switch and unplug the power cord.
C A U T I O N
Make sure you are properly grounded with an ESD strap before continuing.
C A U T I O N
Attempting to slide the entire board under the locking tab will damage the board’s
components.
Summary of Contents for agilent 7683B
Page 10: ...10 Installation Operation and Maintenance...
Page 18: ...18 Installation Operation and Maintenance...
Page 70: ...70 Installation Operation and Maintenance Part 1 Installation 2 Installation...
Page 72: ...72 Installation Operation and Maintenance...
Page 128: ...128 Installation Operation and Maintenance Part 2 Operation 6 Vials and Bottles...
Page 202: ...202 Installation Operation and Maintenance A Cables and Connectors...