120
Installation, Operation, and Maintenance
Part 2, Operation
6
Vials and Bottles
If you use the optional 100-vial tray
You must use the transfer (1-sample) turret.
Place up to 100 samples in the
four tray quadrants, according to the programmed sequence.
shows
tray loading for a sequence that uses tray positions 6 through 21.
Figure 54
Loading tray positions
First vial in
position 6
Last vial in
position 21
Summary of Contents for agilent 7683B
Page 10: ...10 Installation Operation and Maintenance...
Page 18: ...18 Installation Operation and Maintenance...
Page 70: ...70 Installation Operation and Maintenance Part 1 Installation 2 Installation...
Page 72: ...72 Installation Operation and Maintenance...
Page 128: ...128 Installation Operation and Maintenance Part 2 Operation 6 Vials and Bottles...
Page 202: ...202 Installation Operation and Maintenance A Cables and Connectors...