Installation
2
Installation, Operation, and Maintenance
59
Part 1, Installation
Verifying G2912A ALS Controller power configuration
The G2912A ALS Controller can be configured for either 110–120 V power or
for 220–240 V power.
To determine the current power configuration, look at the back panel of the
controller. The fuse holder module below the power cord receptacle is labeled
with 220–240 V on one edge and with 110–120 V on the other. See
To change the power configuration, remove the fuse holder module using a
small, flat-bladed screwdriver in the notch at the top of the fuse holder. Turn it
over and reinstall. See
C A U T I O N
Failure to configure the correct voltage setting will blow the fuses.
Figure 28
G2912A power configurations
USE ONLY
WITH 250V
FUSES/EMPLOYER
UNIQUEMENT A
VEC
DES FUSIBLES DE 250V
110-120 V
220-240 V
USE ONLY WITH 250V
FUSES/EMPLOYER
UNIQUEMENT AVEC
DES FUSIBLES DE 250V
110-120 V
220-240 V
Indicates current voltage configuration
Configured for 110-120 V
Configured for 220–240 V
Notch
Summary of Contents for agilent 7683B
Page 10: ...10 Installation Operation and Maintenance...
Page 18: ...18 Installation Operation and Maintenance...
Page 70: ...70 Installation Operation and Maintenance Part 1 Installation 2 Installation...
Page 72: ...72 Installation Operation and Maintenance...
Page 128: ...128 Installation Operation and Maintenance Part 2 Operation 6 Vials and Bottles...
Page 202: ...202 Installation Operation and Maintenance A Cables and Connectors...