62 Chapter
4
Subsystem
Architecture and Components
4.6.1
Front Bezel Component Locations and Functions
This section illustrates and describes the locations and functions for the front bezel.
ALARM LED (red)
WARNING LED (orange)
READY LED (green)
POWER LED (green)
RKAJAT
WARNING LED (orange)
POWER LED (green)
RKXS
BUZZER OFF SW
Main switch ON
Main switch OFF
Figure 4.10 Front Bezel Component Locations
Table 4.5
Front Bezel Component Functions
Name Function
ALARM LED (red)
Lighting:
Indicates that a failure has occurred which makes the subsystem inoperable.
Blinking:
Low-speed blinking
(Note 1)
: Indicates that a serious failure has occurred while
the power is on.
WARNING LED (orange)
Lighting:
Indicates that a failure occurred, but the subsystem is currently operational.
Blinking:
High-speed blinking
(Note 2)
: Indicates that a failure which does not stop
operation occurred in the unit (it must be deleted with WEB).
Low-speed blinking
(Note 1)
: Indicates that the latest maintenance revision
function of the flash program is executed.
READY LED (green)
Lighting:
Indicates that the subsystem is operational.
Blinking:
High-speed blinking (
Note2
): Indicates that the download of the SENC firmware
is executed. (The READY LED may blink for up to 15 minutes. Even if the
READY LED blinks, the subsystem is operational.)
Low-speed blinking (
Note1
): Indicates that the offline download processing
ended. (It is displayed during the maintenance work.)
POWER LED(green)
Indicates that the power is supplied to the subsystem.
Main switch on
ON: Turns on the power.
Main switch off
OFF Turns off the power.
BUZZER OFF SW
Press this switch when the buzzer sounds to stop the beep. When a serious
hardware failure occurs, (electrical surges of both power supplies and so on), the
buzzer does not stop even when the button is pushed.
Summary of Contents for HDS WMS100
Page 1: ...MK 95DF738 01 Acer HDS WMS100 User and Reference Guide ...
Page 2: ......
Page 8: ...viii Preface ...
Page 12: ...xii Preface ...
Page 22: ...xxii Contents ...
Page 56: ...34 Chapter 2 Planning for Installation and Operation ...
Page 64: ...42 Chapter 3 Powering On Off Procedure ...
Page 188: ...166 Chapter 7 Configuring Storage on the Thunder 9530 V Series Subsystem Ð ...
Page 192: ...170 Chapter 7 Configuring Storage on the Thunder 9530 V Series Subsystem ...
Page 213: ...Acer HDS WMS100 User and Reference Guide 191 Figure 8 7 NNC Information Screen ...
Page 252: ...230 Chapter 8 Troubleshooting ...
Page 270: ...248 Appendix B System Parameter Settings List ...
Page 316: ...294 Appendix F List of Storage Capacities Corresponding to RAID Levels and Configurations ...
Page 320: ...298 Appendix G Port Address Mapping Table ...