Acer | HDS WMS100™ User and Reference Guide
7
Chapter 2
Planning for Installation and Operation
This chapter provides information for planning and preparing a site before and during
installation of the Acer | HDS WMS100 subsystem. Please read this chapter carefully before
beginning your installation planning.
Note:
The general information in this chapter is provided to assist in installation planning
and is not intended to be complete. The internal WMS100 installation and maintenance
documents used by Acer | HDS personnel contain complete specifications. The exact
electrical power interfaces and requirements for each site must be determined and verified
to meet the applicable local regulations. For further information on site preparation for
WMS100 installations, contact your Acer | HDS account team or the Acer | HDS Support
Center.
This chapter includes the following:
User Responsibilities
Safety Precautions
Dimensions and Weight
Service Clearance Requirements
Floor Load Rating
Cable Requirements
Environmental Specifications
Summary of Contents for HDS WMS100
Page 1: ...MK 95DF738 01 Acer HDS WMS100 User and Reference Guide ...
Page 2: ......
Page 8: ...viii Preface ...
Page 12: ...xii Preface ...
Page 22: ...xxii Contents ...
Page 56: ...34 Chapter 2 Planning for Installation and Operation ...
Page 64: ...42 Chapter 3 Powering On Off Procedure ...
Page 188: ...166 Chapter 7 Configuring Storage on the Thunder 9530 V Series Subsystem Ð ...
Page 192: ...170 Chapter 7 Configuring Storage on the Thunder 9530 V Series Subsystem ...
Page 213: ...Acer HDS WMS100 User and Reference Guide 191 Figure 8 7 NNC Information Screen ...
Page 252: ...230 Chapter 8 Troubleshooting ...
Page 270: ...248 Appendix B System Parameter Settings List ...
Page 316: ...294 Appendix F List of Storage Capacities Corresponding to RAID Levels and Configurations ...
Page 320: ...298 Appendix G Port Address Mapping Table ...